Automation index
How much of a Blood bank technician’s job can AI already do?
An automated crossmatch comes earlier. Confirming the group and not issuing the wrong bag do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Blood bank technician
28%
AI can already do 28% of this job.
#120 / 623
View rankingBlood bank technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Group, screen and the bag crossmatch.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Fractionate, label and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The emergency, the massive and the ID error.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Donation, apheresis and the donor who feels unwell.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Stock, expiry and what theatre asks for.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The right bag and owning the blood group.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- crossmatch blood
- blood group
- fractionate products
- donor apheresis
- bag traceability
- massive transfusion
- label units
- blood bank
Sources for this job· O*NET 29-2011.00· ESCO/ISCO 3212
IS WORK OVER?
Civil engineer
25%
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142