Automation index
How much of a Blood bank technician’s job can AI already do?
An automated crossmatch comes earlier. Confirming the group and not issuing the wrong bag do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Blood bank technician
28%
AI can already do 28% of this job.
#120 / 753
View rankingBlood bank technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Group, screen and the bag crossmatch.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Fractionate, label and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The emergency, the massive and the ID error.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Donation, apheresis and the donor who feels unwell.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Stock, expiry and what theatre asks for.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The right bag and owning the blood group.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- crossmatch blood
- blood group
- fractionate products
- donor apheresis
- bag traceability
- massive transfusion
- label units
- blood bank
Sources for this job· O*NET 29-2011.00· ESCO/ISCO 3212
IS WORK OVER?
HVAC engineer
27%
#173 / 753
View rankingHVAC engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Loads, flows and the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Works, the duct and the one they crushed.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Commissioning, the balance and the room that sweats.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Noise, the grille and not leaving the whistle.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the saving and not killing the fresh air.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not sweat, and not oversizing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- load calcs
- air flows
- ducts
- balancing
- grilles
- fresh air
- whistles
- HVAC plant
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149