IS WORK OVER?

Automation index

How much of a Blood bank technician’s job can AI already do?

An automated crossmatch comes earlier. Confirming the group and not issuing the wrong bag do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Blood bank technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Group, screen and the bag crossmatch.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Fractionate, label and traceability.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
The emergency, the massive and the ID error.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Donation, apheresis and the donor who feels unwell.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Stock, expiry and what theatre asks for.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The right bag and owning the blood group.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • crossmatch blood
  • blood group
  • fractionate products
  • donor apheresis
  • bag traceability
  • massive transfusion
  • label units
  • blood bank

Sources for this job· O*NET 29-2011.00· ESCO/ISCO 3212

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 117Delivery driver28%
  2. 118Secretary28%
  3. 119Welder28%
  4. 121Foreign-trade technician28%
  5. 122GIS technician28%
  6. 123Paid media specialist28%