Automation index
How much of a Blood bank technician’s job can AI already do?
An automated crossmatch comes earlier. Confirming the group and not issuing the wrong bag do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Blood bank technician
28%
AI can already do 28% of this job.
#120 / 623
View rankingBlood bank technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Group, screen and the bag crossmatch.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Fractionate, label and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The emergency, the massive and the ID error.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Donation, apheresis and the donor who feels unwell.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Stock, expiry and what theatre asks for.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The right bag and owning the blood group.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- crossmatch blood
- blood group
- fractionate products
- donor apheresis
- bag traceability
- massive transfusion
- label units
- blood bank
Sources for this job· O*NET 29-2011.00· ESCO/ISCO 3212
IS WORK OVER?
Industrial engineer
28%
#102 / 623
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141