Automation index
How much of a Blood bank technician’s job can AI already do?
An automated crossmatch comes earlier. Confirming the group and not issuing the wrong bag do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Blood bank technician
28%
AI can already do 28% of this job.
#120 / 753
View rankingBlood bank technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Group, screen and the bag crossmatch.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Fractionate, label and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The emergency, the massive and the ID error.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Donation, apheresis and the donor who feels unwell.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Stock, expiry and what theatre asks for.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The right bag and owning the blood group.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- crossmatch blood
- blood group
- fractionate products
- donor apheresis
- bag traceability
- massive transfusion
- label units
- blood bank
Sources for this job· O*NET 29-2011.00· ESCO/ISCO 3212
IS WORK OVER?
Substation technician
19%
#660 / 753
View rankingSubstation technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Switching, the sheet and the lockout.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bay, the earth and not going in without it.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Oil, the analysis and the one that bites.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Fault, the disconnector and not resetting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Control and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Open the right one, and not going in unearthed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- switching
- substation sheets
- earths
- bays
- oil
- lockouts
- disconnectors
- not go in unearthed
Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113