Automation index
How much of a Blood bank technician’s job can AI already do?
An automated crossmatch comes earlier. Confirming the group and not issuing the wrong bag do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Blood bank technician
28%
AI can already do 28% of this job.
#120 / 763
View rankingBlood bank technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Group, screen and the bag crossmatch.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Fractionate, label and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The emergency, the massive and the ID error.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Donation, apheresis and the donor who feels unwell.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Stock, expiry and what theatre asks for.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The right bag and owning the blood group.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- crossmatch blood
- blood group
- fractionate products
- donor apheresis
- bag traceability
- massive transfusion
- label units
- blood bank
Sources for this job· O*NET 29-2011.00· ESCO/ISCO 3212
IS WORK OVER?
Tunnel engineer
22%
#410 / 763
View rankingTunnel engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Heading, the geology and the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Water, the inflow and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Blast, the vibration and the building.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Segment, the ring and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not come down, and not hiding the water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tunnel headings
- support
- inflows
- blasts
- segments
- tunnel geology
- rings
- vibrations
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142