Automation index
How much of a Bodyguard’s job can AI already do?
A route comes earlier. Covering the body without playing the hero do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Bodyguard
19%
AI can already do 19% of this job.
#598 / 753
View rankingBodyguard
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Route, advances and the vehicle.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Street, the gap and the one who comes close.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Premises, the exits and not drinking.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Threat, the note and calling it in.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the whim and not yielding security.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Cover the body, and not playing the hero.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- escort routes
- advances
- the vehicle
- premises exits
- threats
- not drink on duty
- gaps
- cover
Sources for this job· O*NET 33-9032.00· ESCO/ISCO 5414
IS WORK OVER?
Gas network engineer
22%
#397 / 753
View rankingGas network engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, pressures and the diameter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Trench, the weld and the one that was not x-rayed.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Leak, the detector and getting people out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cut, the bypass and not leaving them without gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The council, the rush and not covering without testing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the trench does not go up, and not leaving them without gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- network pressures
- diameters
- trenches
- gas welds
- leaks
- detectors
- bypass
- x-rays
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2145