Automation index
How much of a Bodyguard’s job can AI already do?
A route comes earlier. Covering the body without playing the hero do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Bodyguard
19%
AI can already do 19% of this job.
#590 / 743
View rankingBodyguard
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Route, advances and the vehicle.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Street, the gap and the one who comes close.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Premises, the exits and not drinking.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Threat, the note and calling it in.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the whim and not yielding security.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Cover the body, and not playing the hero.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- escort routes
- advances
- the vehicle
- premises exits
- threats
- not drink on duty
- gaps
- cover
Sources for this job· O*NET 33-9032.00· ESCO/ISCO 5414
IS WORK OVER?
Railway engineer
22%
#396 / 743
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142