IS WORK OVER?

Automation index

How much of a Boiler technician’s job can AI already do?

A log and a fault code come earlier. Going into a plant room, and not leaving a building without heat, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Boiler technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Logs, fault codes and spares.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Routes, appointments and permits.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Diagnose, open and repair the boiler.
Estimate

No public source provides a precise figure. This is our estimate.

22%12%+2.6
Tune-up, combustion and pressures.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Clients, porters and plant-room access.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Gas, safety and not leaving the building cold.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Logs, fault codes and spares
  • Routes, appointments and permits
  • Diagnose, open and repair the boiler
  • Tune-up, combustion and pressures
  • Clients, porters and plant-room access
  • calderas
  • tecnico de calderas
  • calefaccion central

Sources for this job· O*NET 49-9021.00· ESCO/ISCO 7126

Piling operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, level and each pile’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, bore and refusal.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Cage, pour and the tube that rides up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vibration, the neighbour and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Plant, access and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
To level, and not cracking party walls.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive piles
  • bore
  • cages
  • refusal level
  • site vibration
  • pour piles
  • piling set-out
  • recoverable tubes

Sources for this job· O*NET 47-2073.00· ESCO/ISCO 7114

Analyse my job

Jobs with similar scores

  1. 466Chiropractor20%
  2. 467Cabin manager20%
  3. 468Lift technician20%
  4. 470Sonographer20%
  5. 471Radiographer20%
  6. 472Family support worker20%