IS WORK OVER?

Automation index

How much of a Boiler technician’s job can AI already do?

A log and a fault code come earlier. Going into a plant room, and not leaving a building without heat, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Boiler technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Logs, fault codes and spares.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Routes, appointments and permits.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Diagnose, open and repair the boiler.
Estimate

No public source provides a precise figure. This is our estimate.

22%12%+2.6
Tune-up, combustion and pressures.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Clients, porters and plant-room access.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Gas, safety and not leaving the building cold.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Logs, fault codes and spares
  • Routes, appointments and permits
  • Diagnose, open and repair the boiler
  • Tune-up, combustion and pressures
  • Clients, porters and plant-room access
  • calderas
  • tecnico de calderas
  • calefaccion central

Sources for this job· O*NET 49-9021.00· ESCO/ISCO 7126

Site engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, axes and the level.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Rebar, cover and the one that is missing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Concrete, the slump and not pouring if it fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Note, the diary and not dressing the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The site manager, the rush and not covering bad steel.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the column is there, and not covering the steel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • setting-out
  • axes
  • rebar
  • cover
  • slump
  • site diary
  • levels
  • not cover steel

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 554Chiropractor20%
  2. 555Cabin manager20%
  3. 556Lift technician20%
  4. 558Sonographer20%
  5. 559Radiographer20%
  6. 560Family support worker20%