IS WORK OVER?

Automation index

How much of a Boilermaker’s job can AI already do?

A drawing and a plate cut come earlier. Marking out, welding and holding pressure do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Boilermaker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, parts lists and material lists.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Mark out, cut, roll and assemble plate.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Weld, fit and erect in shop or on site.
Estimate

No public source provides a precise figure. This is our estimate.

18%22%+4
Leak, pressure and finishing tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Repair boilers, tanks and ducts.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Thickness, codes and liability for the weld.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • mark out plate
  • weld boilers
  • roll plate
  • assemble tanks
  • pressure tests
  • erect on site
  • read boilermaker drawings
  • repair ducts

Sources for this job· O*NET 47-2011.00· ESCO/ISCO 7213

Adult literacy tutor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Level, the sheet and the one who did not come.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Reading, the contract and the small print.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Writing, the form and not doing it for them.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Group, the shame and not exposing them.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The council, the grant and not inflating attendance.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they read the contract, and not being ashamed.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • syllables
  • reading contracts
  • forms
  • literacy groups
  • shame
  • small print
  • attendance
  • not expose

Sources for this job· O*NET 25-3011.00· ESCO/ISCO 2359

Analyse my job

Jobs with similar scores

  1. 229NGO programme officer26%
  2. 230Lathe operator26%
  3. 231Archivist25%
  4. 233CISO25%
  5. 234Volunteer coordinator25%
  6. 235Stockbroker25%