Automation index
How much of a Boilermaker’s job can AI already do?
A drawing and a plate cut come earlier. Marking out, welding and holding pressure do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Boilermaker
25%
AI can already do 25% of this job.
#216 / 633
View rankingBoilermaker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, parts lists and material lists.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Mark out, cut, roll and assemble plate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Weld, fit and erect in shop or on site.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Leak, pressure and finishing tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Repair boilers, tanks and ducts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Thickness, codes and liability for the weld.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- mark out plate
- weld boilers
- roll plate
- assemble tanks
- pressure tests
- erect on site
- read boilermaker drawings
- repair ducts
Sources for this job· O*NET 47-2011.00· ESCO/ISCO 7213
IS WORK OVER?
Alarm installer
23%
#300 / 633
View rankingAlarm installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagram, zones and programming the panel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Wire, sensors and the detector that trips alone.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
ARC, tests and the connection note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Train the user and the fob that gets lost.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The lived-in flat, the brick and not breaking extra.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
No false alarms, and a real call-out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fit alarms
- program panels
- wire sensors
- ARC
- avoid false alarms
- train the user
- detectors
- alarm zones
Sources for this job· O*NET 49-2098.00· ESCO/ISCO 7412