Automation index
How much of a Boilermaker’s job can AI already do?
A drawing and a plate cut come earlier. Marking out, welding and holding pressure do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Boilermaker
25%
AI can already do 25% of this job.
#216 / 633
View rankingBoilermaker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, parts lists and material lists.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Mark out, cut, roll and assemble plate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Weld, fit and erect in shop or on site.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Leak, pressure and finishing tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Repair boilers, tanks and ducts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Thickness, codes and liability for the weld.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- mark out plate
- weld boilers
- roll plate
- assemble tanks
- pressure tests
- erect on site
- read boilermaker drawings
- repair ducts
Sources for this job· O*NET 47-2011.00· ESCO/ISCO 7213
IS WORK OVER?
BIM modeller
28%
#109 / 633
View rankingBIM modeller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, families and clash detection.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
IFC, BEP and trade coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Site, the one who will not open the model, and the meeting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quantities, parameters and the 4D nobody uses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The last-minute change and not breaking the federated model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it can be built, and not over-modelling.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- BIM modelling
- clash detection
- Revit families
- IFC
- BEP
- coordinate trades
- BIM quantities
- federated model
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118