Automation index
How much of a Boilermaker’s job can AI already do?
A drawing and a plate cut come earlier. Marking out, welding and holding pressure do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Boilermaker
25%
AI can already do 25% of this job.
#216 / 623
View rankingBoilermaker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, parts lists and material lists.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Mark out, cut, roll and assemble plate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Weld, fit and erect in shop or on site.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Leak, pressure and finishing tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Repair boilers, tanks and ducts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Thickness, codes and liability for the weld.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- mark out plate
- weld boilers
- roll plate
- assemble tanks
- pressure tests
- erect on site
- read boilermaker drawings
- repair ducts
Sources for this job· O*NET 47-2011.00· ESCO/ISCO 7213
IS WORK OVER?
Commercial diver
18%
#545 / 623
View rankingCommercial diver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, tables and the day’s gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bottom, tool and the one who snags.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Comms, the tender and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Inspection, wet weld or cut.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Current, zero vis and not losing the buddy.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Come up whole, and not skipping decompression.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dive plan
- decompression tables
- wet weld
- tender
- zero vis
- underwater cut
- dive gas
- the bottom
Sources for this job· O*NET 49-9092.00· ESCO/ISCO 7541