Automation index
How much of a Boilermaker’s job can AI already do?
A drawing and a plate cut come earlier. Marking out, welding and holding pressure do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Boilermaker
25%
AI can already do 25% of this job.
#216 / 623
View rankingBoilermaker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, parts lists and material lists.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Mark out, cut, roll and assemble plate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Weld, fit and erect in shop or on site.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Leak, pressure and finishing tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Repair boilers, tanks and ducts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Thickness, codes and liability for the weld.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- mark out plate
- weld boilers
- roll plate
- assemble tanks
- pressure tests
- erect on site
- read boilermaker drawings
- repair ducts
Sources for this job· O*NET 47-2011.00· ESCO/ISCO 7213
IS WORK OVER?
Crane operator
16%
#595 / 623
View rankingCrane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Lift plan, radii and weights.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Run the crane and place the load.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Signals, wind and exclusion zone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site, foreman and maintenance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Logs, inspections and machine tests.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not leaving a load over someone.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Lift plan, radii and weights
- Run the crane and place the load
- Signals, wind and exclusion zone
- Site, foreman and maintenance
- Logs, inspections and machine tests
- Not leaving a load over someone
- gruista
- operador de grua
- crane operator
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343