Automation index
How much of a Boilermaker’s job can AI already do?
A drawing and a plate cut come earlier. Marking out, welding and holding pressure do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Boilermaker
25%
AI can already do 25% of this job.
#247 / 723
View rankingBoilermaker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, parts lists and material lists.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Mark out, cut, roll and assemble plate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Weld, fit and erect in shop or on site.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Leak, pressure and finishing tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Repair boilers, tanks and ducts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Thickness, codes and liability for the weld.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- mark out plate
- weld boilers
- roll plate
- assemble tanks
- pressure tests
- erect on site
- read boilermaker drawings
- repair ducts
Sources for this job· O*NET 47-2011.00· ESCO/ISCO 7213
IS WORK OVER?
Electoral officer
22%
#460 / 723
View rankingElectoral officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Roll, additions and the one who is not there.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Station, the chair and the kit.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Polling day, the incident and the one who protests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Count, the minute and not jumping a result.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The board, the complaint and not losing the box.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the right one votes, and not losing the box.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- electoral roll
- stations
- ballot boxes
- the count
- minutes
- incidents
- polling day
- roll additions
Sources for this job· O*NET 13-1199.00· ESCO/ISCO 3359