Automation index
How much of a Boilermaker’s job can AI already do?
A drawing and a plate cut come earlier. Marking out, welding and holding pressure do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Boilermaker
25%
AI can already do 25% of this job.
#255 / 753
View rankingBoilermaker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, parts lists and material lists.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Mark out, cut, roll and assemble plate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Weld, fit and erect in shop or on site.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Leak, pressure and finishing tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Repair boilers, tanks and ducts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Thickness, codes and liability for the weld.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- mark out plate
- weld boilers
- roll plate
- assemble tanks
- pressure tests
- erect on site
- read boilermaker drawings
- repair ducts
Sources for this job· O*NET 47-2011.00· ESCO/ISCO 7213
IS WORK OVER?
Facilities engineer
22%
#392 / 753
View rankingFacilities engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
CMMS, tickets and the PPM.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Roof, the chiller and the one that will not start.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Generator, the diesel and not leaving it dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fire, the pump and the monthly test.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The tenant, August and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That cooling does not die, and not leaving the generator dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- CMMS
- PPM
- chillers
- generators
- diesel
- fire pumps
- roofs
- tickets
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149