IS WORK OVER?

Automation index

How much of a Boilermaker’s job can AI already do?

A drawing and a plate cut come earlier. Marking out, welding and holding pressure do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Boilermaker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, parts lists and material lists.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Mark out, cut, roll and assemble plate.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Weld, fit and erect in shop or on site.
Estimate

No public source provides a precise figure. This is our estimate.

18%22%+4
Leak, pressure and finishing tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Repair boilers, tanks and ducts.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Thickness, codes and liability for the weld.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • mark out plate
  • weld boilers
  • roll plate
  • assemble tanks
  • pressure tests
  • erect on site
  • read boilermaker drawings
  • repair ducts

Sources for this job· O*NET 47-2011.00· ESCO/ISCO 7213

Property valuer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Comps, cadastre and a first value.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Visit, measurements and defects.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Report, photos and bank annexes.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Client, lender and valuation deadlines.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Valuation rules and liability.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not signing a flat that is not worth that.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Comps, cadastre and a first value
  • Visit, measurements and defects
  • Report, photos and bank annexes
  • Client, lender and valuation deadlines
  • Valuation rules and liability
  • Not signing a flat that is not worth that
  • tasador inmobiliario
  • tasador
  • property valuer

Sources for this job· O*NET 13-2023.00· ESCO/ISCO 3315

Analyse my job

Jobs with similar scores

  1. 213NGO programme officer26%
  2. 214Lathe operator26%
  3. 215Archivist25%
  4. 217CISO25%
  5. 218Volunteer coordinator25%
  6. 219Stockbroker25%