IS WORK OVER?

Automation index

How much of a Boilermaker’s job can AI already do?

A drawing and a plate cut come earlier. Marking out, welding and holding pressure do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Boilermaker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, parts lists and material lists.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Mark out, cut, roll and assemble plate.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Weld, fit and erect in shop or on site.
Estimate

No public source provides a precise figure. This is our estimate.

18%22%+4
Leak, pressure and finishing tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Repair boilers, tanks and ducts.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Thickness, codes and liability for the weld.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • mark out plate
  • weld boilers
  • roll plate
  • assemble tanks
  • pressure tests
  • erect on site
  • read boilermaker drawings
  • repair ducts

Sources for this job· O*NET 47-2011.00· ESCO/ISCO 7213

Route planner

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Optimise, windows and capacity.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Restrictions, tolls and the right vehicle.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
The salesperson who promises and the plan that will not.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Recalc, incidents and the next day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The warehouse, the cut-off and not leaving the last one.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it fits, and not blowing the hours.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • optimise routes
  • delivery windows
  • tolls
  • vehicle capacity
  • recalc
  • traffic restrictions
  • warehouse cut-off
  • driving hours

Sources for this job· O*NET 13-1081.00· ESCO/ISCO 4323

Analyse my job

Jobs with similar scores

  1. 213NGO programme officer26%
  2. 214Lathe operator26%
  3. 215Archivist25%
  4. 217CISO25%
  5. 218Volunteer coordinator25%
  6. 219Stockbroker25%