IS WORK OVER?

Automation index

How much of a Boilermaker’s job can AI already do?

A drawing and a plate cut come earlier. Marking out, welding and holding pressure do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Boilermaker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, parts lists and material lists.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Mark out, cut, roll and assemble plate.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Weld, fit and erect in shop or on site.
Estimate

No public source provides a precise figure. This is our estimate.

18%22%+4
Leak, pressure and finishing tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Repair boilers, tanks and ducts.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Thickness, codes and liability for the weld.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • mark out plate
  • weld boilers
  • roll plate
  • assemble tanks
  • pressure tests
  • erect on site
  • read boilermaker drawings
  • repair ducts

Sources for this job· O*NET 47-2011.00· ESCO/ISCO 7213

SCADA technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Screen, tags and the alarm.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the PLC and the one that will not answer.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Historian, the gap and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Network, the port and not leaving it open.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The shift, the doubt and not hiding the alarm.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they see the alarm, and not dressing the historian.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • SCADA screens
  • alarms
  • historian
  • tags
  • ports
  • field PLC
  • not leave ports open
  • shifts

Sources for this job· O*NET 15-1244.00· ESCO/ISCO 3114

Analyse my job

Jobs with similar scores

  1. 249NGO programme officer26%
  2. 250Lathe operator26%
  3. 251Archivist25%
  4. 253CISO25%
  5. 254Volunteer coordinator25%
  6. 255Stockbroker25%