Automation index
How much of a Boilermaker’s job can AI already do?
A drawing and a plate cut come earlier. Marking out, welding and holding pressure do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Boilermaker
25%
AI can already do 25% of this job.
#216 / 633
View rankingBoilermaker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, parts lists and material lists.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Mark out, cut, roll and assemble plate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Weld, fit and erect in shop or on site.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Leak, pressure and finishing tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Repair boilers, tanks and ducts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Thickness, codes and liability for the weld.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- mark out plate
- weld boilers
- roll plate
- assemble tanks
- pressure tests
- erect on site
- read boilermaker drawings
- repair ducts
Sources for this job· O*NET 47-2011.00· ESCO/ISCO 7213
IS WORK OVER?
Scrum master
25%
#251 / 633
View rankingScrum master
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Facilitate ceremonies, boards and notes.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Flow metrics and impediment reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 38% | +6.1 |
Team coaching and internal conflict.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 15% | +2.7 |
Protect the sprint from interruptions.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Train PO and managers in the method.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Change the system, not just the ritual.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Facilitate ceremonies, boards and notes
- Flow metrics and impediment reports
- Team coaching and internal conflict
- Protect the sprint from interruptions
- Train PO and managers in the method
- Change the system, not just the ritual
- scrum master
- agile coach
Sources for this job· O*NET 13-1111.00· ESCO/ISCO 2421