IS WORK OVER?

Automation index

How much of a Boilermaker’s job can AI already do?

A drawing and a plate cut come earlier. Marking out, welding and holding pressure do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Boilermaker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, parts lists and material lists.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Mark out, cut, roll and assemble plate.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Weld, fit and erect in shop or on site.
Estimate

No public source provides a precise figure. This is our estimate.

18%22%+4
Leak, pressure and finishing tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Repair boilers, tanks and ducts.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Thickness, codes and liability for the weld.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • mark out plate
  • weld boilers
  • roll plate
  • assemble tanks
  • pressure tests
  • erect on site
  • read boilermaker drawings
  • repair ducts

Sources for this job· O*NET 47-2011.00· ESCO/ISCO 7213

Train conductor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Consist, brakes and the departure sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Platform, close-up and the one left outside.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Incidents, Control and the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Ticket staff, the fare dodger and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the points and not leaving early.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Leave nobody behind, and sign the consist.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • train consist
  • platform close-up
  • departure sheet
  • Control
  • brake check
  • line incidents
  • halts
  • delays

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 8312

Analyse my job

Jobs with similar scores

  1. 213NGO programme officer26%
  2. 214Lathe operator26%
  3. 215Archivist25%
  4. 217CISO25%
  5. 218Volunteer coordinator25%
  6. 219Stockbroker25%