Automation index
How much of a Boilermaker’s job can AI already do?
A drawing and a plate cut come earlier. Marking out, welding and holding pressure do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Boilermaker
25%
AI can already do 25% of this job.
#222 / 653
View rankingBoilermaker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, parts lists and material lists.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Mark out, cut, roll and assemble plate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Weld, fit and erect in shop or on site.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Leak, pressure and finishing tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Repair boilers, tanks and ducts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Thickness, codes and liability for the weld.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- mark out plate
- weld boilers
- roll plate
- assemble tanks
- pressure tests
- erect on site
- read boilermaker drawings
- repair ducts
Sources for this job· O*NET 47-2011.00· ESCO/ISCO 7213
IS WORK OVER?
Transplant coordinator
22%
#334 / 653
View rankingTransplant coordinator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Alert, the donor and the protocol.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
ICU, brain death and the one who doubts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Family, three in the morning and not pushing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Logistics, the retrieval team and the plane.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Theatre, the ischaemia time and not losing the organ.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Talk to the family, and not pushing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- donors
- brain death
- family consent
- retrieval teams
- ischaemia time
- ICU
- organ logistics
- not push
Sources for this job· O*NET 29-1141.00· ESCO/ISCO 2269