Automation index
How much of a Boilermaker’s job can AI already do?
A drawing and a plate cut come earlier. Marking out, welding and holding pressure do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Boilermaker
25%
AI can already do 25% of this job.
#216 / 633
View rankingBoilermaker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, parts lists and material lists.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Mark out, cut, roll and assemble plate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Weld, fit and erect in shop or on site.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Leak, pressure and finishing tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Repair boilers, tanks and ducts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Thickness, codes and liability for the weld.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- mark out plate
- weld boilers
- roll plate
- assemble tanks
- pressure tests
- erect on site
- read boilermaker drawings
- repair ducts
Sources for this job· O*NET 47-2011.00· ESCO/ISCO 7213
IS WORK OVER?
Watchmaker
22%
#376 / 633
View rankingWatchmaker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagnose, quote and explain to the client.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Open, strip, clean and oil the movement.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Spares, rate adjustment and calibration.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cases, straps, water resistance and polish.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The counter, commissions and pieces that do not come back.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Times, real spares and a watch that keeps time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- repair watches
- open movements
- oil calibres
- adjust rate
- change straps
- water-resistance test
- diagnose watches
- polish cases
Sources for this job· O*NET 51-9071.00· ESCO/ISCO 7311