IS WORK OVER?

Automation index

How much of a Boilermaker’s job can AI already do?

A drawing and a plate cut come earlier. Marking out, welding and holding pressure do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Boilermaker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, parts lists and material lists.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Mark out, cut, roll and assemble plate.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Weld, fit and erect in shop or on site.
Estimate

No public source provides a precise figure. This is our estimate.

18%22%+4
Leak, pressure and finishing tests.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Repair boilers, tanks and ducts.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Thickness, codes and liability for the weld.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • mark out plate
  • weld boilers
  • roll plate
  • assemble tanks
  • pressure tests
  • erect on site
  • read boilermaker drawings
  • repair ducts

Sources for this job· O*NET 47-2011.00· ESCO/ISCO 7213

Weaver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Warp, weave and the width.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Weave, shuttle and the yarn that snaps.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Finish, fringe and the shrink.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Loom, the rhythm and the commissioned piece.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the colour and not changing the warp halfway.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Without breaking the pick, and a clean weave.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • warp
  • weaves
  • shuttle
  • looms
  • fringe
  • the pick
  • cloth width
  • shrink

Sources for this job· O*NET 51-6062.00· ESCO/ISCO 7318

Analyse my job

Jobs with similar scores

  1. 213NGO programme officer26%
  2. 214Lathe operator26%
  3. 215Archivist25%
  4. 217CISO25%
  5. 218Volunteer coordinator25%
  6. 219Stockbroker25%