IS WORK OVER?

Automation index

How much of a Book restorer’s job can AI already do?

A paper diagnosis comes earlier. Treating without overworking the copy do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Book restorer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagnosis, paper and the proposal.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Clean, infill and the one that falls apart.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sew, bind and the spine.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Box, climate and the store.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The owner, the copy and not leaving it new.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not overworking the copy, and signing the treatment.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • paper
  • infill losses
  • sew sections
  • spines
  • conservation boxes
  • store climate
  • book diagnosis
  • not overwork

Sources for this job· O*NET 25-4013.00· ESCO/ISCO 2621

Aerospace engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, simulate and certify structures and systems.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and traceability.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bench, test flight and incidents.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vendors, quality and EASA.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versions and configuration.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign something that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, tolerances and traceability
  • Bench, test flight and incidents
  • Vendors, quality and EASA
  • Documentation, versions and configuration
  • Sign something that will not fall
  • ingeniero aeronautico
  • aerospace engineer

Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144

Analyse my job

Jobs with similar scores

  1. 374Office receptionist22%
  2. 375Stage manager22%
  3. 376Watchmaker22%
  4. 378Ticket inspector22%
  5. 379Cider maker22%
  6. 380Heat-pump technician22%