Automation index
How much of a Bookbinder’s job can AI already do?
A trim and a groove come earlier. Sewing, casing in and getting the book to open do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Bookbinder
25%
AI can already do 25% of this job.
#255 / 733
View rankingBookbinder
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Trim, gather and prepare sections.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Sew, glue, groove and case in.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Restore spines, endpapers and damaged copies.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Die-cut, foil and special finishes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Commissions, quotes and the client.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Materials, times and a book that lasts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- bind books
- sew sections
- groove spines
- case in boards
- restore books
- foil stamp
- guillotine
- glue
Sources for this job· O*NET 51-5113.00· ESCO/ISCO 7323
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142