Automation index
How much of a Bookbinder’s job can AI already do?
A trim and a groove come earlier. Sewing, casing in and getting the book to open do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Bookbinder
25%
AI can already do 25% of this job.
#221 / 623
View rankingBookbinder
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Trim, gather and prepare sections.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Sew, glue, groove and case in.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Restore spines, endpapers and damaged copies.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Die-cut, foil and special finishes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Commissions, quotes and the client.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Materials, times and a book that lasts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- bind books
- sew sections
- groove spines
- case in boards
- restore books
- foil stamp
- guillotine
- glue
Sources for this job· O*NET 51-5113.00· ESCO/ISCO 7323
IS WORK OVER?
Mining engineer
22%
#341 / 623
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146