Automation index
How much of a Border guard’s job can AI already do?
A crossing profile comes earlier. Looking them in the face without letting through the one who should not do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Border guard
19%
AI can already do 19% of this job.
#593 / 743
View rankingBorder guard
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Crossing, the document and the profile.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Queue, the face and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Search, the right and not humiliating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Return, the minor and not losing them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The boss, the figure and not hunting for sport.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Look them in the face, and not letting through the one who should not.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- border crossings
- documents
- profiles
- searches
- returns
- minors
- queues
- not humiliate
Sources for this job· O*NET 33-3051.00· ESCO/ISCO 5411
IS WORK OVER?
Safety engineer
22%
#393 / 743
View rankingSafety engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
HAZOP, nodes and the minute.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the scenario and the one that was not thought.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
SIL, the valve and not jumping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Incident, the lesson and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Management, the cost and not yielding the interlock.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Stop, and not signing the risk that kills.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- HAZOP
- nodes
- SIL
- safety valves
- incidents
- interlocks
- safety minutes
- not jump
Sources for this job· O*NET 17-2111.00· ESCO/ISCO 2141