Automation index
How much of a Botanist’s job can AI already do?
A digital herbarium comes earlier. Identifying in the field without killing the population do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Botanist
22%
AI can already do 22% of this job.
#361 / 733
View rankingBotanist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Herbarium, keys and the specimen.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the population and not collecting extra.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Survey, the habitat and the one that is lost.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Report, the works and the one who will not hear.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The glasshouse, the culture and not mixing labels.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Identify, and not killing the population.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- herbarium
- keys
- populations
- botanical surveys
- habitats
- collect
- labels
- the field
Sources for this job· O*NET 19-1022.00· ESCO/ISCO 2131
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142