Automation index
How much of a Botanist’s job can AI already do?
A digital herbarium comes earlier. Identifying in the field without killing the population do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Botanist
22%
AI can already do 22% of this job.
#324 / 633
View rankingBotanist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Herbarium, keys and the specimen.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the population and not collecting extra.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Survey, the habitat and the one that is lost.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Report, the works and the one who will not hear.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The glasshouse, the culture and not mixing labels.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Identify, and not killing the population.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- herbarium
- keys
- populations
- botanical surveys
- habitats
- collect
- labels
- the field
Sources for this job· O*NET 19-1022.00· ESCO/ISCO 2131
IS WORK OVER?
Civil engineer
25%
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142