Automation index
How much of a Botanist’s job can AI already do?
A digital herbarium comes earlier. Identifying in the field without killing the population do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Botanist
22%
AI can already do 22% of this job.
#363 / 743
View rankingBotanist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Herbarium, keys and the specimen.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the population and not collecting extra.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Survey, the habitat and the one that is lost.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Report, the works and the one who will not hear.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The glasshouse, the culture and not mixing labels.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Identify, and not killing the population.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- herbarium
- keys
- populations
- botanical surveys
- habitats
- collect
- labels
- the field
Sources for this job· O*NET 19-1022.00· ESCO/ISCO 2131
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142