Automation index
How much of a Brewer’s job can AI already do?
A recipe and a fermentation check come earlier. Tasting the tank and deciding the hops do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Brewer
25%
AI can already do 25% of this job.
#279 / 743
View rankingBrewer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Recipes, mash and the beer’s profile.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Boil, hops and the drop to fermenter.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Taste tanks, dry hop and when to pack.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
CIP, quality and plant microbiology.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Packaging, batches and what hits the bar.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The recipe call and owning the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- brew beer
- mash
- hop the wort
- taste tanks
- fermentation
- CIP
- package beer
- sign the batch
Sources for this job· O*NET 51-9012.00· ESCO/ISCO 8160
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142