IS WORK OVER?

Automation index

How much of a Brewer’s job can AI already do?

A recipe and a fermentation check come earlier. Tasting the tank and deciding the hops do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Brewer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Recipes, mash and the beer’s profile.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Boil, hops and the drop to fermenter.
Estimate

No public source provides a precise figure. This is our estimate.

18%22%+4
Taste tanks, dry hop and when to pack.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
CIP, quality and plant microbiology.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Packaging, batches and what hits the bar.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The recipe call and owning the batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • brew beer
  • mash
  • hop the wort
  • taste tanks
  • fermentation
  • CIP
  • package beer
  • sign the batch

Sources for this job· O*NET 51-9012.00· ESCO/ISCO 8160

Warehouse supervisor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Docks, waves and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
The team, the peak and the one who cannot keep up.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Stock, shrink and the mystery gap.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Safety, forklifts and the near miss.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late haulier and not mixing the docks.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Get the shift out, and not mixing the goods.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plan docks
  • waves
  • warehouse shift
  • shrink
  • forklifts
  • near misses
  • outbound peaks
  • mixed goods

Sources for this job· O*NET 53-1048.00· ESCO/ISCO 1324

Analyse my job

Jobs with similar scores

  1. 240Naval architect25%
  2. 241Chemical engineer25%
  3. 242Interior designer25%
  4. 244Tool and die maker25%
  5. 245Auto mechanic25%
  6. 246Meteorologist25%