IS WORK OVER?

Automation index

How much of a Brewer’s job can AI already do?

A recipe and a fermentation check come earlier. Tasting the tank and deciding the hops do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Brewer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Recipes, mash and the beer’s profile.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Boil, hops and the drop to fermenter.
Estimate

No public source provides a precise figure. This is our estimate.

18%22%+4
Taste tanks, dry hop and when to pack.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
CIP, quality and plant microbiology.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Packaging, batches and what hits the bar.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The recipe call and owning the batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • brew beer
  • mash
  • hop the wort
  • taste tanks
  • fermentation
  • CIP
  • package beer
  • sign the batch

Sources for this job· O*NET 51-9012.00· ESCO/ISCO 8160

Wastewater-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, process and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Basin, the sludge and the one that goes.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Breakdown, the pump and at night.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Test, the discharge and not hiding the spike.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The rain, the overflow and not opening extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come out clean, and the sludge in place.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • works flow
  • sludge
  • basins
  • pumps
  • discharges
  • overflows
  • plant logs
  • final tests

Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132

Analyse my job

Jobs with similar scores

  1. 240Naval architect25%
  2. 241Chemical engineer25%
  3. 242Interior designer25%
  4. 244Tool and die maker25%
  5. 245Auto mechanic25%
  6. 246Meteorologist25%