IS WORK OVER?

Automation index

How much of a Bridge engineer’s job can AI already do?

A model comes earlier. It taking the lorry without signing off a crack do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Bridge engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, loads and the span.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Works, the prestress and the one who did not tension.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Inspection, the crack and not looking away.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Traffic, the closure and not leaving the village hanging.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it takes the lorry, and not signing the crack.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • spans
  • prestress
  • cracks
  • bridge inspection
  • loads
  • traffic closures
  • structural models
  • tensioning

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

District heating engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Balance, flows and the loss.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Chamber, the leak and the one that weeps.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Substation, the valve and the one that will not open.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Winter, the last block and not leaving it cold.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The council, the tariff and not hiding the loss.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the heat arrives, and not hiding the loss.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • heat balances
  • flows
  • network losses
  • chambers
  • heat substations
  • the last block
  • tariffs
  • leaks

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 392Facilities engineer22%
  2. 393Mechatronics engineer22%
  3. 394Mining engineer22%
  4. 396Commissioning engineer22%
  5. 397Gas network engineer22%
  6. 398District heating engineer22%