IS WORK OVER?

Automation index

How much of a Bridge engineer’s job can AI already do?

A model comes earlier. It taking the lorry without signing off a crack do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Bridge engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, loads and the span.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Works, the prestress and the one who did not tension.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Inspection, the crack and not looking away.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Traffic, the closure and not leaving the village hanging.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it takes the lorry, and not signing the crack.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • spans
  • prestress
  • cracks
  • bridge inspection
  • loads
  • traffic closures
  • structural models
  • tensioning

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Site engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, axes and the level.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Rebar, cover and the one that is missing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Concrete, the slump and not pouring if it fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Note, the diary and not dressing the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The site manager, the rush and not covering bad steel.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the column is there, and not covering the steel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • setting-out
  • axes
  • rebar
  • cover
  • slump
  • site diary
  • levels
  • not cover steel

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 388Instrumentation engineer22%
  2. 389Mechatronics engineer22%
  3. 390Mining engineer22%
  4. 392Commissioning engineer22%
  5. 393Safety engineer22%
  6. 394Welding engineer22%