Automation index
How much of a Building surveyor’s job can AI already do?
A take-off and a log come earlier. Directing the build and signing the works do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Building surveyor
22%
AI can already do 22% of this job.
#321 / 633
View rankingBuilding surveyor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Quantities, valuations and cost control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Working drawings and trade coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, visits and safety.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Client, contractor and site team.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, tests and the building book.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign a build that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Quantities, valuations and cost control
- Working drawings and trade coordination
- Site, visits and safety
- Client, contractor and site team
- Quality, tests and the building book
- Sign a build that will not fall
- arquitecto tecnico
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112
IS WORK OVER?
Chiropractor
20%
#466 / 633
View rankingChiropractor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
History, films and a first plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Adjustment, mobilisation and spinal work.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Explain, dose and watch red flags.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Notes, consents and progress.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Room, hygiene and follow-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not over-adjusting or treating the wrong person.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- History, films and a first plan
- Adjustment, mobilisation and spinal work
- Explain, dose and watch red flags
- Notes, consents and progress
- Room, hygiene and follow-up
- quiropractico
- chiropractor
Sources for this job· O*NET 29-1011.00· ESCO/ISCO 2269