Automation index
How much of a Building surveyor’s job can AI already do?
A take-off and a log come earlier. Directing the build and signing the works do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Building surveyor
22%
AI can already do 22% of this job.
#358 / 743
View rankingBuilding surveyor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Quantities, valuations and cost control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Working drawings and trade coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, visits and safety.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Client, contractor and site team.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, tests and the building book.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign a build that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Quantities, valuations and cost control
- Working drawings and trade coordination
- Site, visits and safety
- Client, contractor and site team
- Quality, tests and the building book
- Sign a build that will not fall
- arquitecto tecnico
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112
IS WORK OVER?
Cost engineer
27%
#173 / 743
View rankingCost engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, rates and the budget.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Works, the variance and the one that was not logged.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Change, the extra and not giving it away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Close, the dispute and not inflating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Management, the bid and not selling the reckless one.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The real number, and not the reckless bid.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- measures
- unit rates
- variances
- extras
- disputes
- reckless bids
- works budgets
- closes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142