IS WORK OVER?

Automation index

How much of a Building surveyor’s job can AI already do?

A take-off and a log come earlier. Directing the build and signing the works do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Building surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Quantities, valuations and cost control.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Working drawings and trade coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, visits and safety.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Client, contractor and site team.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quality, tests and the building book.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a build that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Quantities, valuations and cost control
  • Working drawings and trade coordination
  • Site, visits and safety
  • Client, contractor and site team
  • Quality, tests and the building book
  • Sign a build that will not fall
  • arquitecto tecnico

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112

Court case manager

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drive the case, copies and the status.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Steps, notices and gazetting.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Listings, diaries and the court that overflows.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The lawyer who rings, the citizen and the counter.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
File, certified copy and what the senior asks.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The deadline, and not letting the case die.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%29%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive proceedings
  • serve notices
  • listings
  • gazetting
  • certified copies
  • court archive
  • procedural deadlines
  • serve the counter

Sources for this job· O*NET 23-2011.00· ESCO/ISCO 3411

Analyse my job

Jobs with similar scores

  1. 318Insulation installer22%
  2. 319Pesticide applicator22%
  3. 320Archaeologist22%
  4. 322Foley artist22%
  5. 323Poultry farmer22%
  6. 324Botanist22%