IS WORK OVER?

Automation index

How much of a Building surveyor’s job can AI already do?

A take-off and a log come earlier. Directing the build and signing the works do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Building surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Quantities, valuations and cost control.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Working drawings and trade coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, visits and safety.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Client, contractor and site team.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quality, tests and the building book.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a build that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Quantities, valuations and cost control
  • Working drawings and trade coordination
  • Site, visits and safety
  • Client, contractor and site team
  • Quality, tests and the building book
  • Sign a build that will not fall
  • arquitecto tecnico

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112

Doula

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, expectations and what cannot be.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Labour, the house and the one that runs long.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Delivery room, the position and the one who asks for an epidural.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Puerperium, the breast and the come-down.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The midwife, the line and not playing clinician.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Be there, and not replacing the midwife.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • birth plan
  • labour support
  • puerperium
  • breastfeeding
  • positions
  • delivery room
  • not replace the midwife
  • expectations

Sources for this job· O*NET 31-9099.00· ESCO/ISCO 5322

Analyse my job

Jobs with similar scores

  1. 324Insulation installer22%
  2. 325Pesticide applicator22%
  3. 326Archaeologist22%
  4. 328Foley artist22%
  5. 329Poultry farmer22%
  6. 330Botanist22%