IS WORK OVER?

Automation index

How much of a Building surveyor’s job can AI already do?

A take-off and a log come earlier. Directing the build and signing the works do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Building surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Quantities, valuations and cost control.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Working drawings and trade coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, visits and safety.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Client, contractor and site team.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quality, tests and the building book.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a build that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Quantities, valuations and cost control
  • Working drawings and trade coordination
  • Site, visits and safety
  • Client, contractor and site team
  • Quality, tests and the building book
  • Sign a build that will not fall
  • arquitecto tecnico

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112

Hydrogen technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
ATEX, purge and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Electrolyser, the stack and the one that drops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Leak, detector and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Charge, the tube and not mixing with air.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the station and not skipping the purge.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No leak, and the protocol done.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • ATEX
  • purge
  • electrolyser
  • H2 detectors
  • stacks
  • hydrogen stations
  • leaks
  • mix with air

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 323Insulation installer22%
  2. 324Pesticide applicator22%
  3. 325Archaeologist22%
  4. 327Foley artist22%
  5. 328Poultry farmer22%
  6. 329Botanist22%