Automation index
How much of a Building surveyor’s job can AI already do?
A take-off and a log come earlier. Directing the build and signing the works do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Building surveyor
22%
AI can already do 22% of this job.
#346 / 703
View rankingBuilding surveyor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Quantities, valuations and cost control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Working drawings and trade coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, visits and safety.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Client, contractor and site team.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, tests and the building book.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign a build that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Quantities, valuations and cost control
- Working drawings and trade coordination
- Site, visits and safety
- Client, contractor and site team
- Quality, tests and the building book
- Sign a build that will not fall
- arquitecto tecnico
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112
IS WORK OVER?
Instructional designer
27%
#158 / 703
View rankingInstructional designer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Aim, the storyboard and the module.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Pilot, the learner and what is not understood.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Activity, the feedback and not putting a silly test.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
LMS, the figure and not inflating completion.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the deadline and not cutting the practice.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That they learn, and not leaving the empty video.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- course storyboard
- modules
- learner pilot
- activities
- LMS
- completion
- feedback
- not a silly test
Sources for this job· O*NET 25-9031.00· ESCO/ISCO 2351