IS WORK OVER?

Automation index

How much of a Building surveyor’s job can AI already do?

A take-off and a log come earlier. Directing the build and signing the works do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Building surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Quantities, valuations and cost control.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Working drawings and trade coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, visits and safety.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Client, contractor and site team.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quality, tests and the building book.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a build that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Quantities, valuations and cost control
  • Working drawings and trade coordination
  • Site, visits and safety
  • Client, contractor and site team
  • Quality, tests and the building book
  • Sign a build that will not fall
  • arquitecto tecnico

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112

Non-commissioned officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drill, the trade and the sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Barracks, the one who is late and the one who skives.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Guard, the weapon and not sleeping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Field, the mistake and not humiliating in public.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The officer, the order and not leaving the troops hanging.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they know the trade, and not humiliating.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drill
  • barracks
  • guards
  • weapons
  • sheets
  • the troops
  • not humiliate
  • the military trade

Sources for this job· O*NET 55-1017.00· ESCO/ISCO 0110

Analyse my job

Jobs with similar scores

  1. 346Adult literacy tutor22%
  2. 347Pesticide applicator22%
  3. 348Archaeologist22%
  4. 350Foley artist22%
  5. 351Language assistant22%
  6. 352Poultry farmer22%