IS WORK OVER?

Automation index

How much of a Building surveyor’s job can AI already do?

A take-off and a log come earlier. Directing the build and signing the works do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Building surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Quantities, valuations and cost control.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Working drawings and trade coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, visits and safety.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Client, contractor and site team.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quality, tests and the building book.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a build that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Quantities, valuations and cost control
  • Working drawings and trade coordination
  • Site, visits and safety
  • Client, contractor and site team
  • Quality, tests and the building book
  • Sign a build that will not fall
  • arquitecto tecnico

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112

Process engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
P&IDs, balances and the operating procedure.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Plant, trials and the real bottleneck.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Capacity, yields and the improvement report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Start-up, shutdown and the shift that skips the SOP.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Process safety and the HAZOP that hurts.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Not overloading the reactor, and signing the change.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • P&IDs
  • mass balances
  • HAZOP
  • plant start-up
  • improve yields
  • SOP
  • bottlenecks
  • process safety

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 318Insulation installer22%
  2. 319Pesticide applicator22%
  3. 320Archaeologist22%
  4. 322Foley artist22%
  5. 323Poultry farmer22%
  6. 324Botanist22%