IS WORK OVER?

Automation index

How much of a Building surveyor’s job can AI already do?

A take-off and a log come earlier. Directing the build and signing the works do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Building surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Quantities, valuations and cost control.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Working drawings and trade coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, visits and safety.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Client, contractor and site team.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quality, tests and the building book.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a build that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Quantities, valuations and cost control
  • Working drawings and trade coordination
  • Site, visits and safety
  • Client, contractor and site team
  • Quality, tests and the building book
  • Sign a build that will not fall
  • arquitecto tecnico

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112

Residential porter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Shift, the sheet and the letterboxes.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hall, the neighbour and the one who is not.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fault, the water and calling it in.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Move, the lift and not scratching.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The residents, the complaint and not taking sides.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Be there when it floods, and not losing the master.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fault sheets
  • master key
  • the hall
  • letterboxes
  • floods
  • moves
  • the residents
  • not take sides

Sources for this job· O*NET 39-6012.00· ESCO/ISCO 9629

Analyse my job

Jobs with similar scores

  1. 346Adult literacy tutor22%
  2. 347Pesticide applicator22%
  3. 348Archaeologist22%
  4. 350Foley artist22%
  5. 351Language assistant22%
  6. 352Poultry farmer22%