IS WORK OVER?

Automation index

How much of a Building surveyor’s job can AI already do?

A take-off and a log come earlier. Directing the build and signing the works do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Building surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Quantities, valuations and cost control.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Working drawings and trade coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, visits and safety.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Client, contractor and site team.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quality, tests and the building book.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a build that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Quantities, valuations and cost control
  • Working drawings and trade coordination
  • Site, visits and safety
  • Client, contractor and site team
  • Quality, tests and the building book
  • Sign a build that will not fall
  • arquitecto tecnico

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112

Soldier

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Logs, written orders and paper logistics.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Classroom drill and simulators.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Physical drill, weapons and field.
Estimate

No public source provides a precise figure. This is our estimate.

22%6%+1.3
Operations, watch and deployment.
Estimate

No public source provides a precise figure. This is our estimate.

18%8%+1.4
Unit life, discipline and comrades.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Command or be commanded in a real incident.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%14%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Logs, written orders and paper logistics
  • Classroom drill and simulators
  • Physical drill, weapons and field
  • Operations, watch and deployment
  • Unit life, discipline and comrades
  • Command or be commanded in a real incident
  • militar
  • soldado
  • soldier
  • ejercito

Sources for this job· O*NET 55-1011.00· ESCO/ISCO 0110

Analyse my job

Jobs with similar scores

  1. 318Insulation installer22%
  2. 319Pesticide applicator22%
  3. 320Archaeologist22%
  4. 322Foley artist22%
  5. 323Poultry farmer22%
  6. 324Botanist22%