Automation index
How much of a Building surveyor’s job can AI already do?
A take-off and a log come earlier. Directing the build and signing the works do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Building surveyor
22%
AI can already do 22% of this job.
#321 / 633
View rankingBuilding surveyor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Quantities, valuations and cost control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Working drawings and trade coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, visits and safety.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Client, contractor and site team.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, tests and the building book.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign a build that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Quantities, valuations and cost control
- Working drawings and trade coordination
- Site, visits and safety
- Client, contractor and site team
- Quality, tests and the building book
- Sign a build that will not fall
- arquitecto tecnico
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112
IS WORK OVER?
Storyboard artist
27%
#179 / 633
View rankingStoryboard artist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Script, shots and the rhythm.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Draw, arrows and the one that does not read.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Review, the director and the scene change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Delivery, numbering and the missing one.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The budget, the impossible and not drawing a shoot that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it can be shot, and that it reads.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- shots
- camera arrows
- rhythm
- shooting script
- numbering
- review with direction
- scenes
- board delivery
Sources for this job· O*NET 27-1014.00· ESCO/ISCO 2166