IS WORK OVER?

Automation index

How much of a Bus driver’s job can AI already do?

The timetable generates itself. Carrying 50 people, an amber light, and a child at the crossing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Bus driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Run sheet, logs and clocking.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive the route or the charter.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Stops, accessibility and fare or validation.
Estimate

No public source provides a precise figure. This is our estimate.

18%10%+1.8
Incidents, diversions and passenger care.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Pre-trip check and defect reports.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Shifts, fatigue and driving rules.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive
  • route
  • load goods
  • Run sheet, logs and clocking
  • Drive the route or the charter
  • Incidents, diversions and passenger care
  • Pre-trip check and defect reports
  • Shifts, fatigue and driving rules
  • conductor de autobus
  • bus driver

Sources for this job· O*NET 53-3052.00· ESCO/ISCO 8331

Architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Draft plans, sections and a first BIM model from the brief.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Produce renders, views and façade options.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Write quantities, specs and the project report.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Meetings with client, developer and planning office.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Site direction and inspection visits.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Stamp, register and own legal responsibility.
Estimate

No public source provides a precise figure. This is our estimate.

12%8%+1
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Produce renders, views and façade options
  • Site direction and inspection visits
  • arquitect
  • architect
  • proyecto de edificio

Sources for this job· O*NET 17-1011.00· ESCO/ISCO 2161

Analyse my job

Jobs with similar scores

  1. 617Mason15%
  2. 618Referee15%
  3. 619Locksmith15%
  4. 621Professional athlete15%
  5. 622Early childhood educator15%
  6. 623Domestic worker15%