IS WORK OVER?

Automation index

How much of a Bus driver’s job can AI already do?

The timetable generates itself. Carrying 50 people, an amber light, and a child at the crossing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Bus driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Run sheet, logs and clocking.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive the route or the charter.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Stops, accessibility and fare or validation.
Estimate

No public source provides a precise figure. This is our estimate.

18%10%+1.8
Incidents, diversions and passenger care.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Pre-trip check and defect reports.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Shifts, fatigue and driving rules.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive
  • route
  • load goods
  • Run sheet, logs and clocking
  • Drive the route or the charter
  • Incidents, diversions and passenger care
  • Pre-trip check and defect reports
  • Shifts, fatigue and driving rules
  • conductor de autobus
  • bus driver

Sources for this job· O*NET 53-3052.00· ESCO/ISCO 8331

Tower crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Radius, winds and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hoist, trolley and the slinger’s call.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Erect, climb and the base that is checked.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Two-crane lifts and crossing jibs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wind that gets up and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sweep nobody, and not pushing the radius.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tower-crane lifts
  • load charts
  • climb the crane
  • slinger’s call
  • jib wind
  • crossing jibs
  • crane base
  • trolley

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Analyse my job

Jobs with similar scores

  1. 627Mason15%
  2. 628Referee15%
  3. 629Locksmith15%
  4. 631Professional athlete15%
  5. 632Early childhood educator15%
  6. 633Domestic worker15%