IS WORK OVER?

Automation index

How much of a Bus driver’s job can AI already do?

The timetable generates itself. Carrying 50 people, an amber light, and a child at the crossing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Bus driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Run sheet, logs and clocking.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive the route or the charter.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Stops, accessibility and fare or validation.
Estimate

No public source provides a precise figure. This is our estimate.

18%10%+1.8
Incidents, diversions and passenger care.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Pre-trip check and defect reports.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Shifts, fatigue and driving rules.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive
  • route
  • load goods
  • Run sheet, logs and clocking
  • Drive the route or the charter
  • Incidents, diversions and passenger care
  • Pre-trip check and defect reports
  • Shifts, fatigue and driving rules
  • conductor de autobus
  • bus driver

Sources for this job· O*NET 53-3052.00· ESCO/ISCO 8331

Wind-turbine technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SCADA, the code and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, the wind and the one who is sick.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Nacelle, the oil and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rescue, the protocol and not improvising.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The storm, the access and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come down whole, and the turbine running.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm SCADA
  • climb the tower
  • nacelle
  • height rescue
  • oils
  • fault codes
  • access
  • wind

Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412

Analyse my job

Jobs with similar scores

  1. 637Mason15%
  2. 638Referee15%
  3. 639Locksmith15%
  4. 641Professional athlete15%
  5. 642Early childhood educator15%
  6. 643Domestic worker15%